The beams are delivered with the connectors already attached.
First, install the king piles (beams) as you would in any combined sheet pile wall application.
Grasp the sheet piling and thread between the already installed beams.
All welding seams are a minimum ~6mm (~0.25").
Both sides have a continuous minimum tip and toe welding of ~500mm (~20").
Both sides are tack welded in the free length between tip and toe welding with ~200mm/m (~8"/yd). The distance from seam to seam is ~800mm (~31.5") or less.
In salt water, the water side is continuously welded on the whole pile length. Follow the instructions above for the reverse side of the pile, if it is not in contact with salt water.
Please call us, we do answer the phone. Or send us email us and tell us when to call you.